Wednesday, 2 January 2008

Filming the Advert

The thirty second insect repellent advert was filmed within the time allocated, and as planned. The location was of good use, the weather aided the scene that was trying to be set, and the actor and crew were all available and worked their way through the filming as expected.

A lot of footage has been filmed, especially considering the length of the advert, and this will be very important when it comes to editing the footage to produce the final cut.

I will be looking to conduct a meeting with my project tutor to receive some feedback of the edited footage, which will be done in the next day or so.

No comments: